50 kW• Fast24/7Active in MITECO registry

62048041880015

Carretera Aranda, 4, Cantalejo (40320), Segovia, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates41.26429, -3.92811
Official ID2024005163
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cantalejo, belonging to the province of Segovia (Castilla y León, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024005163
Post / EVSE Identifier #1COD20240000041244PR00013417
Post / EVSE Identifier #2ES*ESX*E620480418800151
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000041245PR00013418
Post / EVSE Identifier #5ES*ESX*E620480418800152
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20240000041246PR00013419
Post / EVSE Identifier #8ES*ESX*E620480418800153
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (00:00 - 00:00) Martes (00:00 - 00:00) Jueves (00:00 - 00:00) Viernes (00:00 - 00:00) Sabado (00:00 - 00:00) Lunes (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📅Advance slot reservation supported
🔓Remote plug unlock supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.264286 | Lon: -3.928108View on OpenStreetMap →

Other Nearby Charging Stations

7.36 kW(Standard)
15.2 km away

Las Hoces del Río Duratón

C. Sta. Lucía, 1T, 40300 Sepúlveda, Segovia, España
Operator:Etecnic Movilidad Electrica, SRL
Tipo 2 (Mennekes)
1 point • 1 plug
Details
21 kW(Semi-fast)
17.8 km away

21XP22T3KKJAK00338

Pl. Mayor, 1, 40172 Pedraza, Segovia, Spain
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.