50 kW• Fast24/7Active in MITECO registry

61946054450001

Gómez Laguna (Cooperativa Taxi), 50012, Zaragoza (50012), Zaragoza, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates41.63341, -0.92399
Official ID2023003832
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Zaragoza, belonging to the province of Zaragoza (Aragón, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
21.06 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023003832
Post / EVSE Identifier #1COD20230000013527PR00003801
Post / EVSE Identifier #2ES*ESX*E619460544500011
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000013528PR00003802
Post / EVSE Identifier #5ES*ESX*E619460544500012
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20230000013529PR00003803
Post / EVSE Identifier #8ES*ESX*E619460544500013
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.633415 | Lon: -0.923986View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
1.9 km away

Z-Zaragoza-020

Eduardo Ibarra,S/N
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
3.0 km away

E.S. PORTAZGO

AUTOVÍA DE LOGROÑO KM. 0,3
Operator:ZOILO RIOS, S.A.
CHAdeMOCCS Combo 1Tipo 2 (Mennekes)
1 point • 3 plugs
Details
50 kW(Fast)
3.1 km away

E.S. LOS IBONES

Pº LAGOS DEL ALBA Nº2 (N-232 P.K 243 margen dcho)
Operator:ZOILO RIOS, S.A.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.