50 kW• Fast24/7Active in MITECO registry

61924024950001

Carrer Mas Del Jutge 2A, 4, Torrent (46909), Valencia/València, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates39.43632, -0.48693
Official ID2024005045
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Torrent, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
21.06 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024005045
Post / EVSE Identifier #1COD20240000040973PR00013146
Post / EVSE Identifier #2ES*ESX*E619240249500011
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000040974PR00013147
Post / EVSE Identifier #5ES*ESX*E619240249500012
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20240000040975PR00013148
Post / EVSE Identifier #8ES*ESX*E619240249500013
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Martes (00:00 - 00:00) Miercoles (00:00 - 00:00) Jueves (00:00 - 00:00) Lunes (00:00 - 00:00) Viernes (00:00 - 00:00) Sabado (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)
🔓Remote plug unlock supported
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.436321 | Lon: -0.486933View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
3.3 km away

E-46-Aldaia-001

De La Concordia,6
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.