22 kW• Semi-fast24/7Active in MITECO registry

22XP22T3KKJAK00088

C. Manuel Segura Tárraga, 30740 San Pedro, San Pedro del Pinatar (30740), Murcia, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates37.83835, -0.78936
Official ID2023002903
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Pedro del Pinatar, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002903
Post / EVSE Identifier #1COD20230000014702PR00001919
Post / EVSE Identifier #2ES*ESX*E22XP22T3KKJAK000881
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000014703PR00001920
Post / EVSE Identifier #5ES*ESX*E22XP22T3KKJAK000882
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported
💳RFID Card / Keyfob reader
🔓Remote plug unlock supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.838354 | Lon: -0.789358View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
7.3 km away

E-A-Orihuela-019

Teodoro Llorente Campoamor,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.