50 kW• Fast24/7Active in MITECO registry

21XM32T7KK3AR00053

N-I, Km, 203, 09340 Lerma, Burgos, Spain, Madrigalejo del Monte (09390), Burgos, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates42.04031, -3.75232
Official ID2023002856
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrigalejo del Monte, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002856
Post / EVSE Identifier #1COD20230000014595PR00001812
Post / EVSE Identifier #2ES*ESX*E21XM32T7KK3AR000532
Post / EVSE Identifier #32
Post / EVSE Identifier #4COD20230000014596PR00001813
Post / EVSE Identifier #5ES*ESX*E21XM32T7KK3AR000531
Post / EVSE Identifier #61
Post / EVSE Identifier #7COD20230000014597PR00001814
Post / EVSE Identifier #8ES*ESX*E21XM32T7KK3AR000533
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Lunes (00:00 - 23:59) Domingo (00:00 - 23:59) Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)
🔓Remote plug unlock supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.040314 | Lon: -3.752322View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
0 m away

20XM32T7KK4AR00198

N-I, Km, 203, 09340 Lerma, Burgos, Spain
Operator:ENDESA X WAY, S.L.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
3 points • 3 plugs
Details
50 kW(Fast)
1.8 km away

BU-Lerma-003

Cura Merino,22
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 5 plugs
Details
50 kW(Fast)⛽Estación Repsol
13.8 km away

Repsol ES, Poza Casado S.L.

Cr A-1, 187,7
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.