22 kW• Semi-fast24/7Active in MITECO registry

20XP22T3KK4AL01158

Carretera De San Juan Del Puerto, Km 193,3,, Valverde del Camino (21600), Huelva, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates37.55281, -6.76424
Official ID2024005082
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Valverde del Camino, belonging to the province of Huelva (Andalucía, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024005082
Post / EVSE Identifier #1COD20240000041055PR00013228
Post / EVSE Identifier #2ES*ESX*E20XP22T3KK4AL011581
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000041056PR00013229
Post / EVSE Identifier #5ES*ESX*E20XP22T3KK4AL011582
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Domingo (00:00 - 00:00) Miercoles (00:00 - 00:00) Lunes (00:00 - 00:00) Martes (00:00 - 00:00) Jueves (00:00 - 00:00) Sabado (00:00 - 00:00) Viernes (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported
💳RFID Card / Keyfob reader
🔓Remote plug unlock supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.552807 | Lon: -6.764238View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
14.8 km away

Calañas

Paseo Ramon Regajo, (Barriada Virgen De España) S/N
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
23 kW(Semi-fast)⛽Estación Repsol
21.1 km away

Repsol ES, CRED RIOTINTO

Cr Hu-421, 4,4
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
22 kW(Semi-fast)
21.7 km away

21XP22T3KKJAK00535

C. P.º Del Coso, 21660 Minas De Riotinto,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.