50 kW• Fast24/7Active in MITECO registry

20XM32T8KK4AR00013

C-12, Estamariu (25179), Lleida, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates41.35902, 0.51372
Official ID2023003326
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Estamariu, belonging to the province of Lleida (Cataluña, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
21.06 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023003326
Post / EVSE Identifier #1COD20230000012496PR00002770
Post / EVSE Identifier #2ES*ESX*E20XM32T8KK4AR000132
Post / EVSE Identifier #32
Post / EVSE Identifier #4COD20230000012497PR00002771
Post / EVSE Identifier #5ES*ESX*E20XM32T8KK4AR000131
Post / EVSE Identifier #61
Post / EVSE Identifier #7COD20230000012498PR00002772
Post / EVSE Identifier #8ES*ESX*E20XM32T8KK4AR000133
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.35902 | Lon: 0.513722View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
60 m away

20XM32T8KK4AR00021

C-12
Operator:ENDESA X WAY, S.L.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
3 points • 3 plugs
Details
50 kW(Fast)
12.2 km away

62104044710005

Ajuntament Riba Roja Débre - Plaça De La
Operator:ENDESA X WAY, S.L.
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
3 points • 3 plugs
Details
100 kW(Fast)
13.6 km away

T-Flix-001

C-233,N/A
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.