20.4 kW• Semi-fast🏬Centro Comercial24/7Active in MITECO registry

19XP22T3KK4AZ00948

C.C. Luz Del Tajo - Avenida Del Río Boladiez, Toledo (45007), Toledo, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates39.86302, -3.97531
Official ID2023003574
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Toledo, belonging to the province of Toledo (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
20.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
20.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023003574
Post / EVSE Identifier #1COD20230000013001PR00003275
Post / EVSE Identifier #2ES*ESX*E19XP22T3KK4AZ009481
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000013002PR00003276
Post / EVSE Identifier #5ES*ESX*E19XP22T3KK4AZ009482
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (20.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~59 min(~1 hours)
40 kWh Battery~1 h 58 min(~2 hours)
60 kWh Battery~2 h 56 min(~2.9 hours)
80 kWh Battery~3 h 55 min(~3.9 hours)

Opening Hours

Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.863022 | Lon: -3.975312View on OpenStreetMap →

Other Nearby Charging Stations

250 kW(Ultra-fast)
110 m away

Toledo, Spain

Av. Del Río Boladiez
Operator:Tesla Spain SLU
CCS Combo 2
8 points • 8 plugs
Details
11 kW(Semi-fast)
1.4 km away

NUEVO HOSPITAL DE TOLEDO

AVENIDA DEL RIO GUADIANA, SN
Operator:REMO SUSTAINABLE MOBILITY S.L
Tipo 2 (Mennekes)
34 points • 34 plugs
Details
60 kW(Fast)
1.5 km away

US_55_Toledo_II

Calle Río Jarama
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.