EV Charging Stations in Aguadulce (Sevilla)
As of 24/10/2026, the municipality of Aguadulce (Sevilla) has a total of 2 active public charging stations, with 16 dedicated charging bays and 24 connectors in service. Maximum power output reaches 180 kW, with 24 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Aguadulce
Official consolidated metrics from the public MITECO registry
- Stations
- 2 Physical locations
- Charging Points
- 16 Dedicated bays
- Active Plugs
- 24 Operational outlets
- Fast Charging
- 16 ≥ 43 kW
- Ultra-Fast
- 8 ≥ 150 kW
- Max Power
- 180 kW Peak recorded
Available Connectors in Aguadulce
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 16 plugs |
| Tipo 2 (Mennekes) | 8 plugs |
Power Distribution in Aguadulce
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 8 plugs |
| Fast (43 to 149 kW) | 16 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Aguadulce
2 stations mappedInteractive EV Charging Map
2 charging stations ready to explore
All EV Charging Locations in Aguadulce
Verified specs, connector types and speeds from the official ministry registry
Restaurante El Marqués - Aguadulce
Frequently Asked Questions in Aguadulce
How many public EV charging points are there in Aguadulce?
Aguadulce currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 24 operational charging plugs.
Are fast charging stations available in Aguadulce?
Yes, Aguadulce features 24 fast and ultra-fast charging plugs (≥43 kW up to 180 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Aguadulce?
Public charging infrastructure in Aguadulce is mainly operated by Tesla Spain SLU, CHARGING TOGETHER SL, among other regional networks.
Closest Neighboring Towns to Aguadulce with EV Chargers
Physical proximity calculated via GPS Haversine distance from Aguadulce
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.