EV Charging Stations in Baiona (Pontevedra)
As of 24/10/2026, the municipality of Baiona (Pontevedra) has a total of 3 active public charging stations, with 6 dedicated charging bays and 6 connectors in service. Maximum power output reaches 22 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Baiona
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 6 Dedicated bays
- Active Plugs
- 6 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 22 kW Peak recorded
Available Connectors in Baiona
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 6 plugs |
Power Distribution in Baiona
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 6 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Baiona
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Baiona
Verified specs, connector types and speeds from the official ministry registry
62005004480010
62009004500002
Frequently Asked Questions in Baiona
How many public EV charging points are there in Baiona?
Baiona currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 6 operational charging plugs.
Are fast charging stations available in Baiona?
Currently, charging stations in Baiona provide standard and semi-fast charging up to 22 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Baiona?
Public charging infrastructure in Baiona is mainly operated by ENDESA X WAY, S.L., WENEA EMOBILITY SERVICES S.L., among other regional networks.
Closest Neighboring Towns to Baiona with EV Chargers
Physical proximity calculated via GPS Haversine distance from Baiona
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.