EV Charging Stations in Sober (Lugo)

How many EV charging points are there in Sober?

As of 24/10/2026, the municipality of Sober (Lugo) has a total of 1 active public charging stations, with 1 dedicated charging bays and 2 connectors in service. Maximum power output reaches 44 kW, with 2 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Sober

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
1
Dedicated bays
Active Plugs
2
Operational outlets
Fast Charging
2
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
44 kW
Peak recorded

Available Connectors in Sober

Charging connectors by type in Sober
Connector TypeActive Plugs
Tipo 2 (Mennekes)2 plugs

Power Distribution in Sober

Charging plugs distribution by power in Sober
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)2 plugs
Semi-fast (7.4 to 22 kW)0 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Sober

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Sober

Verified specs, connector types and speeds from the official ministry registry

Frequently Asked Questions in Sober

How many public EV charging points are there in Sober?

Sober currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 2 operational charging plugs.

Are fast charging stations available in Sober?

Yes, Sober features 2 fast and ultra-fast charging plugs (≥43 kW up to 44 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Sober?

Public charging infrastructure in Sober is mainly operated by Galp Energía España, S.A.U., among other regional networks.

Closest Neighboring Towns to Sober with EV Chargers

Physical proximity calculated via GPS Haversine distance from Sober

All towns in Lugo
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.