EV Charging Stations in Santa María del Camí (Balears, Illes)

How many EV charging points are there in Santa María del Camí?

As of 24/10/2026, the municipality of Santa María del Camí (Balears, Illes) has a total of 9 active public charging stations, with 10 dedicated charging bays and 20 connectors in service. Maximum power output reaches 80 kW, with 7 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Santa María del Camí

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
9
Physical locations
Charging Points
10
Dedicated bays
Active Plugs
20
Operational outlets
Fast Charging
7
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
80 kW
Peak recorded

Available Connectors in Santa María del Camí

Charging connectors by type in Santa María del Camí
Connector TypeActive Plugs
Tipo 2 (Mennekes)11 plugs
Schuko (Enchufe doméstico)3 plugs
CCS Combo 24 plugs
CHAdeMO2 plugs

Power Distribution in Santa María del Camí

Charging plugs distribution by power in Santa María del Camí
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)7 plugs
Semi-fast (7.4 to 22 kW)8 plugs
Standard (< 7.4 kW)5 plugs

EV Charging Stations Map in Santa María del Camí

9 stations mapped

Interactive EV Charging Map

9 charging stations ready to explore

All EV Charging Locations in Santa María del Camí

Verified specs, connector types and speeds from the official ministry registry

22 kW(Semi-fast)✓ Cable24/7

Carrer Coanegra (estació SFM) 2

Carrer Coanegra (estació SFM)
Operator:AJUNTAMENT DE SANTA MARIA DEL CAMI
Tipo 2 (Mennekes)Schuko (Enchufe doméstico)
1 point • 2 plugs
Details
22 kW(Semi-fast)✓ Cable24/7

Carrer Coanegra (estació SFM)

Carrer Coanegra (estació SFM)
Operator:AJUNTAMENT DE SANTA MARIA DEL CAMI
Tipo 2 (Mennekes)Schuko (Enchufe doméstico)
1 point • 2 plugs
Details
7.4 kW(Semi-fast)✓ Cable24/7

Av. Jaume III

Av. Jaume III
Operator:AJUNTAMENT DE SANTA MARIA DEL CAMI
Tipo 2 (Mennekes)Schuko (Enchufe doméstico)
1 point • 2 plugs
Details
7.4 kW(Semi-fast)✓ Cable🏨Hotel / Alojamiento24/7

Plaça Hostals

Plaça Hostals
Operator:AJUNTAMENT DE SANTA MARIA DEL CAMI
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
3 kW(Standard)✓ Cable24/7

Av. Josep Verd Sastre

Av. Josep Verd Sastre
Operator:AJUNTAMENT DE SANTA MARIA DEL CAMI
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
7.4 kW(Semi-fast)✓ Cable24/7

Plaça Nova

Plaça Nova
Operator:AJUNTAMENT DE SANTA MARIA DEL CAMI
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
80 kW(Fast)⚡ 800V✓ CableHorario habitual

BODEGAS MACIA BATLE

Camí Coanegra, s/n
Operator:REMO SUSTAINABLE MOBILITY S.L
CCS Combo 2
1 point • 2 plugs
Details
50 kW(Fast)✓ Cable⛽Estación Repsol24/7

Repsol ES, LLODRA SL

Cr C-713, 13,1
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details

Frequently Asked Questions in Santa María del Camí

How many public EV charging points are there in Santa María del Camí?

Santa María del Camí currently has 9 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 20 operational charging plugs.

Are fast charging stations available in Santa María del Camí?

Yes, Santa María del Camí features 7 fast and ultra-fast charging plugs (≥43 kW up to 80 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Santa María del Camí?

Public charging infrastructure in Santa María del Camí is mainly operated by AJUNTAMENT DE SANTA MARIA DEL CAMI, REMO SUSTAINABLE MOBILITY S.L, Etecnic Movilidad Electrica, SRL, among other regional networks.

Closest Neighboring Towns to Santa María del Camí with EV Chargers

Physical proximity calculated via GPS Haversine distance from Santa María del Camí

All towns in Balears, Illes
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.