EV Charging Stations in Uceda (Guadalajara)
As of 24/10/2026, the municipality of Uceda (Guadalajara) has a total of 2 active public charging stations, with 4 dedicated charging bays and 4 connectors in service. Maximum power output reaches 22 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Uceda
Official consolidated metrics from the public MITECO registry
- Stations
- 2 Physical locations
- Charging Points
- 4 Dedicated bays
- Active Plugs
- 4 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 22 kW Peak recorded
Available Connectors in Uceda
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 4 plugs |
Power Distribution in Uceda
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 4 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Uceda
2 stations mappedInteractive EV Charging Map
2 charging stations ready to explore
All EV Charging Locations in Uceda
Verified specs, connector types and speeds from the official ministry registry
GU-Uceda-001
Frequently Asked Questions in Uceda
How many public EV charging points are there in Uceda?
Uceda currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 4 operational charging plugs.
Are fast charging stations available in Uceda?
Currently, charging stations in Uceda provide standard and semi-fast charging up to 22 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Uceda?
Public charging infrastructure in Uceda is mainly operated by IBERDROLA CLIENTES S.A.U, among other regional networks.
Closest Neighboring Towns to Uceda with EV Chargers
Physical proximity calculated via GPS Haversine distance from Uceda
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.