EV Charging Stations in Cornellà del Terri (Girona)
As of 24/10/2026, the municipality of Cornellà del Terri (Girona) has a total of 5 active public charging stations, with 11 dedicated charging bays and 11 connectors in service. Maximum power output reaches 60 kW, with 4 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Cornellà del Terri
Official consolidated metrics from the public MITECO registry
- Stations
- 5 Physical locations
- Charging Points
- 11 Dedicated bays
- Active Plugs
- 11 Operational outlets
- Fast Charging
- 4 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 60 kW Peak recorded
Available Connectors in Cornellà del Terri
| Connector Type | Active Plugs |
|---|---|
| CHAdeMO | 1 plug |
| CCS Combo 2 | 3 plugs |
| Tipo 2 (Mennekes) | 7 plugs |
Power Distribution in Cornellà del Terri
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 4 plugs |
| Semi-fast (7.4 to 22 kW) | 7 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Cornellà del Terri
5 stations mappedInteractive EV Charging Map
5 charging stations ready to explore
All EV Charging Locations in Cornellà del Terri
Verified specs, connector types and speeds from the official ministry registry
C6E06BCC22UJSDVDSF
62225022070024
62225022070022
62225022070023
Frequently Asked Questions in Cornellà del Terri
How many public EV charging points are there in Cornellà del Terri?
Cornellà del Terri currently has 5 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 11 operational charging plugs.
Are fast charging stations available in Cornellà del Terri?
Yes, Cornellà del Terri features 4 fast and ultra-fast charging plugs (≥43 kW up to 60 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Cornellà del Terri?
Public charging infrastructure in Cornellà del Terri is mainly operated by ENDESA X WAY, S.L., among other regional networks.
Closest Neighboring Towns to Cornellà del Terri with EV Chargers
Physical proximity calculated via GPS Haversine distance from Cornellà del Terri
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.