EV Charging Stations in Hernani (Gipuzkoa)
As of 24/10/2026, the municipality of Hernani (Gipuzkoa) has a total of 8 active public charging stations, with 30 dedicated charging bays and 35 connectors in service. Maximum power output reaches 250 kW, with 27 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Hernani
Official consolidated metrics from the public MITECO registry
- Stations
- 8 Physical locations
- Charging Points
- 30 Dedicated bays
- Active Plugs
- 35 Operational outlets
- Fast Charging
- 19 ≥ 43 kW
- Ultra-Fast
- 8 ≥ 150 kW
- Max Power
- 250 kW Peak recorded
Available Connectors in Hernani
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 20 plugs |
| CHAdeMO | 5 plugs |
| Tipo 2 (Mennekes) | 10 plugs |
Power Distribution in Hernani
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 8 plugs |
| Fast (43 to 149 kW) | 19 plugs |
| Semi-fast (7.4 to 22 kW) | 8 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Hernani
8 stations mappedInteractive EV Charging Map
8 charging stations ready to explore
All EV Charging Locations in Hernani
Verified specs, connector types and speeds from the official ministry registry
Hotel Txintxua
SS-Hernani-001
SS-Hernani-002
TotalEnergies - Hotel Txintxua
Mercadona, Jauregi Bailara, Gipuzkoa
Repsol ES, CRED Hernani Izdo.
Repsol ES, CRED Hernani Dcho
Frequently Asked Questions in Hernani
How many public EV charging points are there in Hernani?
Hernani currently has 8 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 35 operational charging plugs.
Are fast charging stations available in Hernani?
Yes, Hernani features 27 fast and ultra-fast charging plugs (≥43 kW up to 250 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Hernani?
Public charging infrastructure in Hernani is mainly operated by REPSOL SOLUCIONES ENERGÉTICAS SA, IBERDROLA CLIENTES S.A.U, Tesla Spain SLU, among other regional networks.
Closest Neighboring Towns to Hernani with EV Chargers
Physical proximity calculated via GPS Haversine distance from Hernani
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.