EV Charging Stations in Lezama (Bizkaia)
As of 24/10/2026, the municipality of Lezama (Bizkaia) has a total of 2 active public charging stations, with 10 dedicated charging bays and 12 connectors in service. Maximum power output reaches 22.17 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Lezama
Official consolidated metrics from the public MITECO registry
- Stations
- 2 Physical locations
- Charging Points
- 10 Dedicated bays
- Active Plugs
- 12 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 22.17 kW Peak recorded
Available Connectors in Lezama
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 10 plugs |
| Tipo 1 (Yazaki) | 2 plugs |
Power Distribution in Lezama
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 2 plugs |
| Standard (< 7.4 kW) | 10 plugs |
EV Charging Stations Map in Lezama
2 stations mappedInteractive EV Charging Map
2 charging stations ready to explore
All EV Charging Locations in Lezama
Verified specs, connector types and speeds from the official ministry registry
Repsol, Lezama, Parking público
Frequently Asked Questions in Lezama
How many public EV charging points are there in Lezama?
Lezama currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 12 operational charging plugs.
Are fast charging stations available in Lezama?
Currently, charging stations in Lezama provide standard and semi-fast charging up to 22.17 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Lezama?
Public charging infrastructure in Lezama is mainly operated by IBERDROLA CLIENTES S.A.U, REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to Lezama with EV Chargers
Physical proximity calculated via GPS Haversine distance from Lezama
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.