EV Charging Stations in Curtis (Coruña, A)
As of 24/10/2026, the municipality of Curtis (Coruña, A) has a total of 2 active public charging stations, with 8 dedicated charging bays and 8 connectors in service. Maximum power output reaches 100 kW, with 6 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Curtis
Official consolidated metrics from the public MITECO registry
- Stations
- 2 Physical locations
- Charging Points
- 8 Dedicated bays
- Active Plugs
- 8 Operational outlets
- Fast Charging
- 6 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 100 kW Peak recorded
Available Connectors in Curtis
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 4 plugs |
| CHAdeMO | 2 plugs |
| Tipo 2 (Mennekes) | 2 plugs |
Power Distribution in Curtis
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 6 plugs |
| Semi-fast (7.4 to 22 kW) | 2 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Curtis
2 stations mappedInteractive EV Charging Map
2 charging stations ready to explore
All EV Charging Locations in Curtis
Verified specs, connector types and speeds from the official ministry registry
TotalEnergies - E.S. CEPSA Mavilar
Frequently Asked Questions in Curtis
How many public EV charging points are there in Curtis?
Curtis currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 8 operational charging plugs.
Are fast charging stations available in Curtis?
Yes, Curtis features 6 fast and ultra-fast charging plugs (≥43 kW up to 100 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Curtis?
Public charging infrastructure in Curtis is mainly operated by Wenea Services Spain, S.L., TotalEnergies Charging Services España, SLU, among other regional networks.
Closest Neighboring Towns to Curtis with EV Chargers
Physical proximity calculated via GPS Haversine distance from Curtis
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.